Brief specification
Beam: 5.8m (19'02'')
Draft: 2.75m (9'01")
Built: 1981
Refit: 2005 to 2016
Cabins: 4 with 2 Pullman
Guests: 10 sleeping
Crew/additional guests 4 sleeping
Hull Construction: Steel
Superstructure : Aluminium
Hull Configuration: Displacement
Engines: 2 x Perkins M300 TI
Cruising Speed: 8.5 knots
Maximum Speed: 10 knots
Dry Weight: 91000 kgs
Total Power: 600 HP
Stabilizer Vosper
Accomodation
Main deck: the master stateroom features the following elements: a queen size bed located in the middle, a LCD TV in front of the bed, DVD player and satellite decoder, numerous shelves, 2 cupboards for the clothes, 2 large windows of which one is opening. The bathroom is equipped with a bath tub with shower, a bidet and the toilet. The floor is made out of wood.
Lower deck : 3 other guest cabins with en-suite bathrooms.
VIP cabin features a queen size bed, LCD TV, 4 portholes which can be opened and a walk-in closet.
The en-suite bathroom features a shower, bidet, toilet and 1 sink. There is also 1 opening porthole located in the bathroom. Both guests staterooms, with en-suite shower rooms, are identical and each feature 2 twin beds (190 x 80 cm) and a pullman bed.
Latest Works
In 2005:
- Installation of a hydraulic side ladder
- Bow thruster
- New access from the main aft deck to the flybridge with a very nice ladder in teak and stainless steel
- New crane on flybridge
- New teak on fly-bridge
- Refit of teak on main deck
- New paint on hull and superstructure
- Addition of a sun pad on the flybridge
- Addition of a fridge on flybridge
- Addition of a watermaker (100l/h)
- Addition of manual blinds in the salon
- New decoration in the salon
- Soft furniture re-upholstered
- Addition of a new dining table on flybridge including: tables , 3 chairs , 2 stools and 2 loungers
- New teak table on Aft deck and 2 chairs
- New linen
- New deck lights
- Addition of a dish-washer in galley
- Refit of the bridge
- New navigation equipment (chart plotter, navtex, CCTV for engine room et aft deck)
- Creation of a new area for washing machine and dryer.
2007:
- Change of 2 generators Onan 22,5 KW in replacement of 1 unique generator of 13 KW
- Improvement of the ventilation system in Engine room
2009:
- 2 new main engines
- Addition of a Raymarine chart plotter on the flybridge
2010:
- New battery charger
2012:
- Hull thickness measurement et change of a few plates
- New ice maker added in galley
2013:
- Change of both aft deck winches
- New batteries for main engines and comfort (gel)
2015:
- Change of the starboard anchor chain (120m) and 2 new stainless steel anchors
- New LCD TV in salon
- Satellite signal in salon, master stateroom and bridge
- New TV/DVD player in the VIP stateroom
- New pump for grey water system
- New fire pump
- New fresh water pump
2016 :
- Hull thickness measurement .No change of plates needed.
.New paint