Installed Extras:
Kohler 25kW generator (4000 hours, last service May 2022)
Service battery pack: 8 x 210 ah Huawei gel batteries (New from August 2021)
Shore power socket and cable
Waeco SinePower 2000W, 24V inverter
Victron Phoenix 2000W, 24V inverter
2 x Waeco Perfect Power DCDC40 24VDC/12VDC converter
2 x Quick SBC 1450 24VDC, 60AH battery charger
Waeco Perfect Charge 252A battery charger
Mastervolt Charge Master 24V, 60AH battery charger
Magnetic compass
GPS Chartplotter
2 x Gi8 LCD system monitor
Steering wheel
Rotary warning light remote control unit
Quick brand chain meter remote control unit
Raymarine autopilot
Raymarine depth, speed and seawater temperature indicator
Horn
2 x Bow sliding roof controls
2 x Aft sliding roof controllers
3 x Battery parallel connection controllers
Engine bilge pump, cabin bilge pump, navigation lights, anchor lights, dashboard lights controllers
Maneuvering joystick
GPS chartplotter push-button panel
BSC trim tabs controller
2 x Remote throttle levers
EVC control engine panels
EVC engine displays
4 x Engine keys
Wiper controller
Raymarine Ray240e VHF
Raymarine VHF speaker
2 x Ventilation openings
2 x Electrical sliding doors and controller switch
Special lever for opening the doors in case of emergency
Electrical sliding hardtop roof
Electrical sliding aft roof
2 x Electrical pilot seats
Besenzoni hydraulic gangway
Hydraulic swimming platform
Electrical Dinghy garage
Climma air conditioning system in all cabins and salon
Climma Vega MK II A/C control units in all cabins and saloon
Absolute ambiance and lighting system in all cabins and salon except crew cabin
Arcelik 250 l refrigerator with deep freeze in the galley
Gaggenau oven in the galley
Gaggenau dishwasher in the galley
Bosch induction burner in the galley
Wet-bar with sink, refrigerator and grill in the cockpit
2 x Quick electrical winches in the cockpit
Table and “U-shaped” seating area, including chairs in the cockpit
Cockpit cushions
Hidden entrance for crew cabin in the cockpit
Main 220 VAC and 24 DC electrical control panels in the personnel cabin
Washer/Dryer machine in the crew cabin
Small galley, sink, induction burner and mini refrigerator for crew cabin
Crew bathroom and head
Bunk bed for two crew
TV in the crew cabin
Entrance to the engine room from crew cabin
Additional engine room entrance from the cockpit floor
Hydraulic gangway remote control
Boat garage remote controller
Lighting panel for the Dinghy and winch in the boat garage
Hot/cold shower on aft platform
Guest cabin with two single beds and music system
Hidden TVs in the Master and VIP cabins
2 x sofa in the saloon
TV in the saloon
Engine room emergency fire extinguishing system (manual/automatic)
Portable fire extinguishers in all cabins and saloon
4 x Smoke detector system (Salon, crew cabin, engine room, galley hall)
Smoke alarm siren in engine room
Quick 2000W windlass (last service May 2022, batteries renewed -NEW)
2 x windlass remote controller unit
12 mm 140 m chain (galvanized at May 2021)
Ultra 45 kg anchor
2 x electrical bilge pump in the engine room
Electrical bilge pump in the crew cabin
2 x electrical bilge pumps in the cabins
Backup bilge pump system
Boiler 80 l
Sunbathing and seating cushion at the bow deck
Teak covered deck, cockpit, side decks and platform
Projector at the bow
Mooring ropes
Life vests
Life raft
Zar ZF 2 Dinghy 3,6 m with Yamaha 60 hp (compatible with water sports, last serviced in May 2022)
4 x Solar panels 135 Watt (Total : 540 Watt)
Victron connect Bluetooth solar regulator
Raymarine Flir night vision camera
Cockpit safety camera
Engine room safety camera
Bimini top at the bow deck (installed in 2021)
Cabins and salon carpets renewed in 2021
Central sweeping system
Engine service: May 2020 / Injectors renewed by Bosch authorized service
Engines service: May 2020 / 3 pieces of Turbo repaired with the original repair kits. One of them renewed. Brand new.
Engines service: May 2020 / 3 pieces of intercooler repaired with the original repair kits. One of them renewed. Brand new.
Engines last service: May 2021 / IPS engines take out and the membranes renewed. After the renovation, engines used max 30 hours.