Installed equipment:
- Crew cabin
- carbon hard top with electric awning
- telescopic gangway - 4 m
- Hydraulic tenderlift platform with 400kg working load capacity
- HUMPHREE fin stabilizer
- Cummins Onan generator 17,5kW - 50Hz
- Air conditioning 78,000 BTU/h
- Garmin Gold Package (Nr.4 x 12'' Chartplotters: 2 for saloon and 2 for flybridge, Open Array 4kw HD)
- Electric stern thruster with variable speed
- 8kW variable bow thruster- 24VDC, D. 250mm
- Joystick control for engines and thrusters (main helm, flybridge, 3rd control station in cockpit grp unit)
- teak on all decks including swimming platform
Full list of options is available upon request
All photos are real and taken in September 2024.